RAC test trench images
Return to Mark Lemmon home page.
(Click on them for larger versions)
Here is the RA working area anaglyph. The trench was dug 2/3 from left
to the right, near the flag.
The trench after the first (10-cm) dig.
Anaglyph of the 10-cm dig.
Images of the trench walls at 50-cm depth.